Load Transfer
- Bear dynamic loads such as curtain wall wind pressure and seismic force to ensure the stability of the building structure.
- Connect the steel structure to the concrete foundation to achieve force balance and avoid later installation deviations.
Precise Positioning
- Control the installation accuracy (±3mm error range) during the pre-embedded stage to provide a rapid alignment basis for subsequent equipment/components.
- The reserved adjustment slot design allows ±15mm position correction to adapt to construction errors.
Durability Guarantee
- The surface adopts hot-dip galvanizing (80-120μm) or epoxy spraying process to prevent alkaline corrosion of concrete.
- The seismic design meets the building's 50-year service life requirements and passes the 2000-hour salt spray test (ASTM B117 standard).



